TASOCS

Fast Facts

The Company: TASOCS – Welshpool, Western Australia


The Challenge: TASOCS are a large use electricity consumer in manufacturing. The challenge was to install solar and maximise savings while minimising interruption to business.

The Approach: Amanda Energy analysed the electricity consumption and designed a tailored system to meet TASOCS needs.

 

The Solution: Use more efficient panels in a landscape position to optimise maximum exposure to sunlight and co-ordinate delivery and installation with management at specific times to ensure production continued.

 

The Results: The system was installed and approved by Western Power within 4 weeks. This delivered savings to TASOCS in time for the summer peak electricity period.