The Challenge
To supply Kailis Bros with faultless power as temperature control is fundamental to their small-medium business through the Amanda Energy DSM program.

Case Study

The Approach
To meet with management and analyse the power outages and current supply for Kailis Bros and tailor an Energy Management solution to maximise efficiency, prevent loss of power due to blackouts and help reduce energy costs.

Both electricity consumption and energy efficiency were areas of concern contributing to increasing costs for Kailis Bros. The Canning Vale industrial area, where Kailis Bros’ main processing facility is located, is known for its regular power outages.

Peter Mirco stated that “Amanda Energy offered a simple, thorough capital intensive which put Kailis Bros in a position where taking part in the DSM program was beneficial and viable. By offering to fund and install a site specific generator for Kailis Bros, Amanda Energy provided a solution which not only maintains Kailis Bros operations when asked to go ‘off the grid’ for DSM calls, but also secured the added benefit to Kailis Bros of being self-sufficient during power outages, which are notoriously common in our area.”

The Solution
To supply and install a 1 megawatt backup generator ensuring Kailis Bros were constantly supplied with power throughout power outages and help reduce peak demand and decrease capacity charges.

The Results
“Martin approached us with his idea, made the process as simple as could be done and fulfilled the supply of the generator within the promised time frame. This put Kailis Bros in the position to be available for DSM events for the October 2011 supply year. Required technical support has been arranged and the generator has already delivered on its promise. Kailis bros has no hesitation in recommending Amanda Energy to prospective clients.”
Peter Mirco, Kailis Bros

“Amanda Energy provided a solution, they made the process as simple as could be done and fulfilled the supply of the generator within the promised time frame.”

Peter Mirco, Kailis Bros