The Company
TASOCS – Welshpool, Western Australia
The Challenge
TASOCS are a large use electricity consumer in manufacturing. The challenge was to install solar and maximise savings while minimising interruption to business.
The Approach
Amanda Energy analysed the electricity consumption and designed a tailored system to meet TASOCS needs.
The Solution
Use more efficient panels in a landscape position to optimise maximum exposure to sunlight and co-ordinate delivery and installation with management at specific times to ensure production continued.
The Results
The system was installed and approved by Western Power within 4 weeks. This delivered savings to TASOCS in time for the summer peak electricity period.
“Amanda Energy delivered as promised and made the whole process easy.”
Michael Murphy, TASOCS